DilliC and SAFe: a map for coaches and auditors

Draft of 1 November 2026. Last updated 22 November 2026.

This document maps DilliC to the Scaled Agile Framework, construct by construct, for the release train engineer, coach or auditor who must say whether an organisation running SAFe in DilliC has what the framework asks for. Each row says what SAFe asks, what DilliC does, where on the screen to see it, and a grade. It ends with a walk through a live account that can be ticked along in an hour.

Three words grade every row, the same three the ITIL map and the security questionnaire use. Yes: DilliC does it and keeps a record. In part: DilliC does some of it, and the row says what the organisation supplies by practice. No: DilliC does not do it; the organisation does it elsewhere.

SAFe and Scaled Agile Framework are registered trade marks of Scaled Agile, Inc. DilliC is not a Scaled Agile partner or a certified tool, and this map is our own reading of SAFe 6 against the product as it is today. It is written from the user guide and the code; the chapter numbers refer to the user guide. SAFe 6 renamed the program increment the planning interval and the program board the ART planning board; DilliC says planning interval and program board.

1. How much SAFe runs, and what each level adds

SAFe is not one thing, so DilliC does not switch it on as one. An administrator chooses a level under Administration → Scaling (chapter 19), for the whole organisation, and each level is the one before it plus more:

Level Adds
Not used Initiatives, epics, stories, boards and sprints, as every account has them. WSJF, the risk register, velocity and flow, cross-team dependencies and the timeline are here too, because they predate the framework and any team may want them.
Essential SAFe Planning intervals with iterations generated across every team on the train at once; PI objectives with business value, committed and stretch; the confidence vote; the program board; enabler features and enabler stories; predictability. Sprints read as iterations and epics as features.
SAFe with portfolio management The portfolio kanban and value streams, given to the roles that manage the portfolio.
Full SAFe Large solution: capabilities rolling up across the trains beneath a solution.

Two rules govern the choice, and both matter to an auditor. Raising a level adds and moves nothing: new rungs sit beside the existing ones, no work item is re-levelled or re-parented, and the administrator is shown what will be provisioned before confirming. Lowering a level hides rather than deletes: the screens stop appearing, nothing written is removed, and raising the level again finds the work where it was. An epic's business case cannot evaporate because somebody stepped back a level for a quarter.

SAFe's objects map onto things DilliC already had wherever the existing thing answered the question. An agile release train is an entity with teams beneath it; a SAFe epic is an initiative, which already carries a budget, a KPI with a target and a parent initiative on the parent entity; a capability is an initiative one level further down the same tree; a feature is a rung added beside the epic rung; a dependency is a work item link. The one structural addition is the planning interval, because a cadence shared across several teams is the only thing a board cannot express. Two nouns are not renameable while SAFe runs, planning interval and PI objective, because they are what the training and the room call them; every other noun stays the organisation's own.

2. Team and ART level: Essential SAFe

SAFe asks for DilliC does Where Status
Agile teams running Scrum or Kanban. Each team is an entity with a board, and each board chooses its methodology and keeps it whatever the SAFe level. A Kanban board carries WIP limits. Delivery; chapter 9. Yes
An agile release train: five to twelve teams on one cadence. An entity with teams beneath it has no board of its own; its Delivery page reads the teams' boards one level up, columns grouped by what a status means. A planning interval is scoped to the train. Delivery above the teams; chapter 9 and 10. Yes
Iterations of a fixed length, shared across the train. A planning interval has a start, an iteration length and a count. Generate iterations puts every team on the train onto the same dates; a team whose sprints already overlap is skipped and named. Delivery → Planning intervals; chapter 10. Yes
The planning interval, with an innovation and planning iteration. Name, start, iteration length and count, a goal, and whether the last iteration is for innovation and planning. Planning intervals. Yes
PI planning: the event where teams plan together. DilliC holds what the event produces, the objectives, the confidence vote, the risks and the program board, and nothing of the event itself. The organisation runs the two days. Planning intervals; the program board. In part
Team PI objectives with business value, committed and uncommitted. Each team writes objectives with a business value of 1 to 10 and a committed or stretch mark. Start locks the commitments; the wording can still be corrected. At the end, the value each delivered is entered, and the interval cannot close while a committed objective has none. An objective may name a factor and then carries that factor's KPI and the target standing when it was written, tying the team's promise to the criterion its entity is assessed against. Planning intervals; chapter 10. Yes
The confidence vote. A vote of 1 to 5 recorded on the interval. Planning intervals. Yes
Program risks, ROAMed. Risks raised with what might happen, likelihood and impact, the initiative threatened, and answered as resolved, owned, accepted or mitigated; the matrix places them; the interval records its own. Delivery → Risks & dependencies; Planning intervals; chapter 9. Yes
The program board: features by iteration, dependencies drawn. Teams down the side, the interval's iterations across the top; each feature in the earliest iteration its work is planned in; dependencies as dashed lines, one running backwards in time drawn in red and counted; features not yet in an iteration listed beneath. The board reads the plan and is changed on the teams' boards. Delivery → Program board; chapter 10. Yes
Features and enablers on the ART backlog; stories on team backlogs. At Essential, epics read as features and are ranked by WSJF; enabler features and enabler stories are rungs of their own. A story is estimated in points, by planning poker if the team likes. The organisation names every rung under Vocabulary & estimation. Backlog; Administration → Vocabulary & estimation; chapter 15. Yes
WSJF to rank the ART backlog. Business value, time criticality and risk reduction over job size, on one ladder the organisation words; computed and never stored; an incomplete score leaves the item unranked rather than bottom. Offered on every account, whatever level. Administration → Priority; the backlog. Yes
Iteration planning with capacity. A sprint has a goal, a capacity in points and, once planned, a capacity per person; Who has what adds up the points per person and shows what nobody has picked up. Delivery → Sprints; chapter 9. Yes
The daily stand-up. A stand-up view per sprint: per person, blocked first, then in progress, not started and done, with anything done since yesterday marked. A sprint's menu. Yes
Iteration review and retrospective. Report: what finished, what did not, and what was added or removed after the start. Retrospective: a write-up the AI assistant can draft from the sprint's numbers. Charts are drawn from what happened move by move, so re-estimating today does not rewrite last sprint. A sprint's menu. Yes
System demo, ART sync, inspect and adapt. Not held in DilliC. The interval's metrics and each sprint's report are the material for them. — No
Cross-team dependencies. Read from links that cross teams, in two lists: work waiting on another team, and another team waiting on us. A dependency is late when the needed work arrives no earlier than the work that needs it, and late ones come first. Delivery → Risks & dependencies. Yes
Architectural runway. Enabler features and enabler stories carry the work. There is no runway view beyond the backlog and the flow distribution that says what share of an interval went to enablers. The backlog; the interval's report. In part
The continuous delivery pipeline and release on demand. Commits and pull requests tie to work items; pipelines report deployments by environment; versions are released when the organisation chooses, independent of the iteration; change requests authorise them where the organisation runs change control. The ITIL map covers this end. Administration → Connections; Delivery → Release path; chapter 21. Yes
Built-in quality. A definition-of-done can be an approval gate on a move; a change request carries a test plan; the risk questionnaire asks whether it was tested like production. The standards themselves are the organisation's. Administration → Workflow & approvals. In part
SAFe roles: release train engineer, product management, system architect, business owners, product owner, scrum master. Roles are the organisation's own to write, with the rights each holds, and a role applies to an entity and those beneath. No SAFe roles ship by name. Business value is entered by whoever holds the right, and the record keeps who. Administration → Roles; chapter 14. In part

3. Large solution: Full SAFe

SAFe asks for DilliC does Where Status
A solution train over several ARTs. An entity above the trains. Its Delivery page shows initiatives on the board and solutions on the timeline, read from everything beneath. Delivery above the teams. Yes
Capabilities spanning trains. At Full SAFe, a capability is an initiative one level down the entity tree, and the roll-up reads across the trains beneath it. No new decomposition rung is introduced. Initiatives; chapter 19. Yes
The solution backlog, pre- and post-PI planning, the solution demo. Not held in DilliC beyond the initiatives and the trains' intervals. — No

4. Portfolio: SAFe with portfolio management

SAFe asks for DilliC does Where Status
The portfolio kanban. Initiatives as epics through Funnel, Reviewing, Analyzing, Portfolio backlog, Implementing and Done or Cancelled, ordered within each column by WSJF. Entering the portfolio backlog is gated by Lean Portfolio Management: two approvers, not the proposer. Not on the portfolio yet lists initiatives nobody has proposed. Portfolio; chapter 10. Yes
The epic hypothesis statement and lean business case. On each epic: the hypothesis, business outcomes, leading indicators, the MVP, non-functional requirements, and the value stream funding it. The epic's card. Yes
Lean budgets and guardrails per value stream. A value stream has a budget and a guardrail, soft (warn when committed exceeds the budget) or hard (refuse a funding move the stream cannot afford). It shows what is committed, proposed and spent, and warns when over. A stream and the initiatives it funds share a currency. Portfolio → Value streams. Yes
Development and operational value streams. Value streams fund epics, which is the development kind. Operational value streams are not modelled as such; the services a part of the organisation runs (chapter 9) are the nearest thing, and a factor, an assessment, an initiative, a risk and a PI objective may each belong to one of them. Portfolio; Delivery → Services. In part
Strategic themes and the portfolio vision. Factors and objectives per part of the organisation, with KPIs and targets, rolled up the hierarchy, and a Benefits tab reading whether the initiatives move them. No portfolio vision document and no themes as a list of their own. Needs the Planning module. Strategic planning; chapter 5. In part
Business and enabler epics. An initiative is an epic; the epic hypothesis says which it is. No separate enabler mark at the portfolio level. Portfolio. In part
KPIs and OKRs. A measure/KPI library with units, ranges, roll-up rules and readings; the noun renames to Key results under Vocabulary. Objectives on factors carry targets and dates. Administration → Measures/KPIs; chapter 19. Yes
Participatory budgeting. Not held in DilliC. — No

5. Measure and grow

SAFe asks for DilliC does Where Status
Predictability: delivered business value over committed. Computed per team from the two values the business owners signed, at the two ends of the interval. Stretch objectives count towards delivered and never towards committed, so committing to less is not the winning move. A train's figure is the average of its teams', weighted by the hierarchy's weights where the organisation sets them, not the ratio of the sums. A planning interval's report. Yes
Flow metrics: velocity, cycle time, flow distribution. Velocity per iteration and across the train; feature cycle time from first start to first finish, so a reopening is not averaged in; what the interval was spent on, by rung; a team's control chart and cumulative flow over dates you choose. Velocity counts work completed, never cancelled. A sprint's How it's going; the interval's report. Yes
Flow load, flow time, flow efficiency. All three, read from the event log. Flow time is the cycle time, first started to first finished. Flow load is the cumulative flow, what sat in each state on each day. Flow efficiency is the time an item spent in progress or being reviewed over its cycle time, totalled across the finished items so a long wait weighs what it cost. A team's How it's going; the interval's metrics; the sprint report; the cycle time gadget. Yes
Outcomes: did the work move the number? The Benefits tab reads each objective's KPI against its target and whether each initiative serving it is adopted and effective. The Adoption module measures the people side. Strategic planning → Benefits; Adoption; chapter 5 and 8. Yes
Competency assessments. Not shipped. An organisation can write its own factors and survey them with an assessment, which is the same instrument. Assessments; chapter 6. In part

6. What the organisation supplies by practice

Where a row says In part or No, the organisation covers it outside the tool. A coach should look for these beside the DilliC evidence.

  • The events. PI planning, the system demo, ART sync and inspect and adapt are held in a room or a call. DilliC supplies their inputs and records their outputs.
  • The roles. Who is the release train engineer, product management and the business owners, written as DilliC roles with the rights to write objectives, enter business value and move the portfolio.
  • Definitions of done and the other quality standards, as Pages, with the gates that enforce them.
  • The portfolio vision and strategic themes, as Pages or elsewhere, with the factors and objectives that carry them into measurement.
  • Participatory budgeting and the setting of value-stream budgets, done in the meeting and typed into the value streams afterwards.

7. The coach's walk through a live account

Each line is a thing to look at in a running account, with what should be there. Where a line fails, either DilliC is not configured that way or the practice is not being followed; both are findings.

Configuration

  • Administration → Scaling: the level is Essential or above, and the preview, if the level is about to change, shows what would be provisioned and that no work moves.
  • Administration → Vocabulary & estimation: the rungs include a feature rung ranked by WSJF and the enabler rungs, in the organisation's words.
  • Administration → Priority: WSJF's four components are on one ladder with the organisation's wording.
  • Administration → Roles: roles exist for whoever writes objectives, enters business value and manages the portfolio, and they are held by named people on the right entities.
  • Administration → Hierarchy: the train is an entity with its teams beneath it, and the solution, if Full SAFe, an entity above.

The current interval

  • Delivery → Planning intervals: the current interval has iterations generated across every team; any team skipped is named and the reason known.
  • Each team's objectives carry a business value and a committed or stretch mark, and the interval was started, so the commitments are locked.
  • A confidence vote is recorded, and the interval's risks are ROAMed with none left open past the first iteration.
  • Delivery → Program board: every feature sits in an iteration or is listed beneath; no dependency is drawn in red, or each that is has an owner and a plan.
  • The backlog ranks features by WSJF and no feature in the interval is unscored.

The last interval

  • The closed interval shows delivered value against every committed objective, and predictability is read, per team and for the train.
  • Its flow distribution shows a share for enablers, or the organisation can say why it is zero.
  • A sprint in it has a report and a retrospective written.

Portfolio, if the level reaches it

  • Portfolio: every epic in the portfolio backlog or beyond carries a hypothesis, a lean business case and a value stream, and passed the LPM gate with two approvals not the proposer's.
  • Value streams: each has a budget and a guardrail, and none is over without a note.

Outcomes

  • Strategic planning → Benefits: the objectives the interval's PI objectives named show a trend, and at least one initiative reads as adopted and effective, or the organisation can say when it will.

8. Keeping this map true

The map describes the product on the date above. The product specification's section 13.1 sets out which SAFe objects map to which DilliC objects and why, and the user guide's chapters 10 and 19 describe the screens. A row that no longer matches the product is a defect in this document, and we would like to hear of it at support@dillic.app.

This is the same document the hosted service serves from its trust page, read from the release that is running. All documents.